Gratierne Zeolite · internal · planned, not built

A zeolite plant in Denmark, and the alternative at the mine in Bulgaria

The plan is a 4.5 ha plant near Fredericia that dries, screens and packs zeolite, develops new products and makes its own electricity from manure. It costs about €55 m all in*. Here are the films, the reports and the arithmetic.

Every figure is our own estimate without supplier quotes. * marks an own estimate. The plant is planned, not built.

2.24 GWhof electricity a year, whole plant*
280 kWgas engine covers it*
€33.4 mmost money tied up, 50,000 t*
€42.9 mcash after five years at list price*

What the plan is

The core factory

Rock in from the quay, dried, screened into five fractions, milled to powder and packed in big bags, sacks and small packs.

Development and packing

A pilot line and laboratory for new products, and two packing lines for retail goods.

Power from manure

A biogas plant on about 27,900 t of manure a year and a 280 kW gas engine. The manure lies within 9.8 km.

The loop

Three trucks collect manure and zeolite bags from streams and fish farms; fibre, zeolite and a phosphorus material become fertiliser pellets.

Three sizes

25,000, 50,000 and 100,000 t a year: €32.4 m, €43.3 m and €57.7 m for site and plant*.

Honest arithmetic

The budget shows what it means if everything sells at list price. It is not a sales forecast, and the reports show what happens if it does not.

Films

Five films in Danish and English. Play them here, or download the full-size file.

The school tour

A guide and two pupils walk the 50,000 t plant and ride the pickup trucks.

12 min · Download full size (1.6 GB)

The economy

Planning, building and years 1–5, the what-ifs, and the three sizes.

11 min · Download full size (1.5 GB)

Fly-through of the site plan

Building by building over the 4.5 ha.

4 min · Download full size (0.6 GB)

The mine in Bulgaria

The same class visits the planned mine at Most and follows the rock home by train and ship.

11 min · Download full size (1.5 GB)

Mine, factory and farm together

The whole plant placed at the mine: factory, backup line, demonstration farm and a biogas plant that covers all the power.

12 min · Download full size (1.6 GB)

Reports

Every report is available in Danish and English.

PDF

The Danish plant

Factory, electricity, biogas, manure catchment, water, phosphorus, fertiliser, economy.

20 pages · 3.2 MB · PDF · Dansk
PDF

Five-year budget, 50,000 t

The first plant, year by year, at list price.

8 pages · 0.4 MB · PDF · Dansk
PDF

Five-year budget, 25,000 t

The half plant, with the three sizes side by side.

10 pages · 0.4 MB · PDF · Dansk
PDF

Five-year budget, 100,000 t

The double plant, with the three sizes side by side.

10 pages · 0.4 MB · PDF · Dansk
PDF

Options for the plant

Backup line, demonstration farm, the plant at the mine, a biogas plant with no electricity bought.

9 pages · 0.9 MB · PDF · Dansk
PDF

Site plan, Denmark

A3: zones, buildings, traffic and land use.

4 pages · 1.0 MB · PDF · Dansk
PDF

Site plan, the mine

A3: pit, plant and the link to the station.

4 pages · 0.6 MB · PDF · Dansk

Options, 14 November 2026

Backup line: €3.7 m*

A second, half-rate line at the middle and the large plant. It pays if it saves two or three days of sales a year.

Demonstration farm: −€0.29 m a year*

A pig stable with two identical sections and a 40 ha test field at the large plant show farmers how to cut every route of pollution. Their value is the measurements.

No electricity bought: +€1.8 m*

Three 500 kW engines and one of 200 kW, a gas store and 63,000 t of manure make the large plant self-supplied, hour by hour.

At the mine: €218 against €317 a tonne*

A big bag lands cheaper in Denmark when the factory stands at the mine. Cash after five years at 50,000 t: €42.9 m → €78.6 m. But the concession is small, the rock is different, and the farm belongs in Denmark.